Good morning,

...

Question

Is it possible to add dry dock/offhire between voyages in Dataloy VMS?

Answer

Yes, it possible to add dry dock/offhire between voyages in the system and cannot find out how to do this? Need clarification in order to freeze the next fixtures.

Thanks in advance.

 

Step-by-step guide

 

...

Dataloy VMS.

Panel
bgColor#fff

To add dock/offhire between voyages:

  1. Go to Modules > Voyage Estimate.
  2. Create a voyage as per usual in the Main Calculations field except for the Cargo Details section.
  3. Go to the Cargoes field to the middle right-hand side and remove the by default highlighted existing cargo line.
  4. Go to the Port Rotation field at the upper right-hand side.
  5. Click Insert and from the menu select appropriate option.
  6. The Please Select a Port to Insert pop-up opens.
  7. Either
    1. enter applicable port under Port Name or
    2. click the Triple Dot Selector next to the field. A pop-up with a list of ports opens. Select port and click OK.
  8. Either
    1. enter Dry Dock (DD) under Reason for Call or
      Note: Will by default state LOADING (L).
    2. click the Triple Dot Selector next to the field. A pop-up with a list of reason for calls opens. Select Dry Dock (DD) and click OK.
  9. Click OK in the The Please Select a Port to Insert pop-up. The pop-up will close and the added dry dock port will display as a row in the Port Rotation field.
  10. Freeze the voyage.

Filter by label (Content by label)
showLabelsfalse
max5
spacesVMSKB
sortmodified
showSpacefalse
reversetrue
typepage
labelskb-how-to-article

Page Properties
hiddentrue
Related issues
Jira Legacy
serverId8396bdcc-145c-3b48-8d7d-1e296f4a3587
keyDSD-3446