Good morning,
...
Question
Is it possible to add dry dock/offhire between voyages in Dataloy VMS?
Answer
Yes, it possible to add dry dock/offhire between voyages in the system and cannot find out how to do this? Need clarification in order to freeze the next fixtures.
Thanks in advance.
Step-by-step guide
...
Dataloy VMS.
Panel |
---|
|
To add dock/offhire between voyages: - Go to Modules > Voyage Estimate.
- Create a voyage as per usual in the Main Calculations field except for the Cargo Details section.
- Go to the Cargoes field to the middle right-hand side and remove the by default highlighted existing cargo line.
- Go to the Port Rotation field at the upper right-hand side.
- Click Insert and from the menu select appropriate option.
- The Please Select a Port to Insert pop-up opens.
- Either
- enter applicable port under Port Name or
- click the Triple Dot Selector next to the field. A pop-up with a list of ports opens. Select port and click OK.
- Either
- enter Dry Dock (DD) under Reason for Call or
Note: Will by default state LOADING (L). - click the Triple Dot Selector next to the field. A pop-up with a list of reason for calls opens. Select Dry Dock (DD) and click OK.
- Click OK in the The Please Select a Port to Insert pop-up. The pop-up will close and the added dry dock port will display as a row in the Port Rotation field.
- Freeze the voyage.
|
Related articles
Filter by label (Content by label) |
---|
showLabels | false |
---|
max | 5 |
---|
spaces | VMSKB |
---|
sort | modified |
---|
showSpace | false |
---|
reverse | true |
---|
type | page |
---|
labels | kb-how-to-article |
---|
|
Page Properties |
---|
|
Related issues | Jira Legacy |
---|
serverId | 8396bdcc-145c-3b48-8d7d-1e296f4a3587 |
---|
key | DSD-3446 |
---|
|
|
---|
|