Short Description
...
1. All features implemented for Estimate voyages (create, update, copy, move etc) should also be available for Unallocated voyages
2. All business logic which depends on a voyage being Estimate, Budget, Unallocated or Actual should take Unallocated into consideration so that Unallocated voyages does not have impact on calculations of other voyages
3. All reports which depends on a voyage being Estimate, Budget, Unallocated or Actual should take Unallocated into consideration so that Unallocated voyages does not have impact on report output
...
To Create an Unallocated Voyage (Voyage Charter) using Voyage Estimate
- Create a new voyage charter or locate and/or copy an existing one to be scheduled as an unallocated voyage by following the step-by-step instructions at To Create a Voyage Charter Calculation/Estimate, Steps 1-8.
- If the voyage is
- not COA-based: leave LayCan fields of applicable cargo blank in the Cargoes field (for duplicated voyages: delete any existing LayCan dates).
Note: Laycan fields are to be blank to enable scheduling at whatever date, for example for "dummy-voyages".
Example: - COA-based: Ensure the COA is linked to the estimate (COA field) and enter laycan dates.
- not COA-based: leave LayCan fields of applicable cargo blank in the Cargoes field (for duplicated voyages: delete any existing LayCan dates).
- Go to the Voyage menu and from the drop-down select Schedule > Unallocated Voyage....
- The Freeze Voyage - Check These Values Before Proceeding pop-up will open.
Example: - Fill in the fields as follows (as applicable):
- Enter either
- the name of the company responsible for the voyage under Company Name (MANDATROY) or
- click the Triple Dot Selector next to the field. A pop-up with a list of input values will open. Select field and click OK.
- The name of the business unit responsible for the voyage under Business Unit Name (MANDATROY).
- Enter the name of the pool responsible for the voyage (if applicable) under Pool Name.
- Enter applicable trade route under Trade/Pattern.
- Enter the name of the person responsible for the voyage under under Responsible Charterer.
- Enter the name of the person responsible for operating the voyage under Responsible Operator.
- Enter the number of days that compose the demurrage timebar (if any) under Demurrage Timebar.
- Enter either
- the charter party (CP) date under CP Dat or
- click the Triple Dot Selector next to the field. A pop-up with a calendar will open. Select date and click OK.
- The Last Voyage for current CP will always by default be disabled when creating an unallocated voyage charter voyage.
- Enter the vessel earning point under Vessel Earning Point.
Note: ONLY used to override if the vessel used in the voyage calculation has a different vessel earning point than the intended vessel for the voyage. - The Vessel IMO No field displays a vessel's IMO number.
Note: Disabled by default, i.e. possible to freeze voyage without IMO. To enable - contact Dataloy. - The Internal Relet section - leave blank.
Note: Disabled by default. ONLY activates when a voyage is a Time Charter (TC) In AND the selected business unit when freezing is other than business unit in the TC contract. - Enter the index against which the voyage will be measured (or benchmarked) under TC Benchmark Index.
- Enter the percentage of the index a voyage is benchmarked against under Percent.
Note: Defaults to 100%. - Enter applicable Payment terms (if any).
Note: Payment in a COA linked to the calculation or default payment terms added via the Charterer automatically displays. - Enter a payment term for each cargo:
- If multiple payment terms, enter in per cent the amount to be paid under the first payment term under %.
Note: If a single payment term - enter 100. - Enter applicable payment term under Payment Term.
- Enter applicable baseline term under Baseline Term.
- If multiple payment terms, shows in per cent the amount to be paid under the second payment term under %.
Note: If a single payment term - will show 0. - If a second payment term - enter the second payment term under Payment Term 2.
- If a second payment term - enter the second baseline term under Baseline Term 2.
- Click Proceed. A pop-up will open advising that scheduling the voyage has succeded. Click OK.
- The voyage calculation will automatically move to the Booking and Operations module as an Unallocated Voyage (i.e. a planned, and often contracted voyage, that has yet to be assigned a vessel, listed under Booking and Operations > Vessel List Tab > Unallocated).
Note: Only ONE unallocated voyage can be created at a time. Also, the voyage status indicator in the Voyage Estimate module changes from solid green to “T with purple background" (also referred to as “TCalc”).
Example:
...
To Create an Unallocated Voyage (Time Charter Out) using Voyage Estimate
- Create a new time charter out or locate and/or copy an existing one to be scheduled as an unallocated voyage by following the step-by-step instructions at To Create a Time Charter Out Calculation/Estimate, Steps 1-8.
- Go to the Voyage menu and from the drop-down select Schedule > Unallocated Voyage....
- The TC Contract dialogue box will open.
Example: - Review and enter relevant details in each respective tab as per applicable instructions on the Time Charter Contracts page (under To enter a Time Charter (TC) In Contract).
Note: Quick calculations need not have all details entered, only calculations to become fixtures. The TC Out Contract dialogue box tabs corresponds to the Time Charter Contracts tabs as the same details are needed, irrespective of it being a TC In or Out. - Click Proceed.
- The dialogue box will close and the Freeze Voyage - Check These Values Before Proceeding pop-up will open.
- Fill in the fields as follows:
- Enter either
- the name of the company responsible for the voyage under Company Name (MANDATROY) or
- click the Triple Dot Selector next to the field. A pop-up with a list of input values will open. Select field and click OK.
- The name of the business unit responsible for the voyage under Business Unit Name (MANDATROY).
- Enter the name of the pool responsible for the voyage (if applicable) under Pool Name.
- Enter applicable trade route under Trade/Pattern.
- Enter the name of the person responsible for the voyage under under Responsible Charterer.
- Enter the name of the person responsible for operating the voyage under Responsible Operator.
- Enter either
- the charter party (CP) date under CP Date (MANDATORY) or
- click the Triple Dot Selector next to the field. A pop-up with a calendar will open. Select date and click OK.
- Check Last Voyage for current CP if vessel is under TC In contract and on its final voyage prior to re-delivery. Otherwise - leave UNCHECKED.
- Enter the vessel earning point under Vessel Earning Point.
Note: ONLY used to override if the vessel used in the voyage calculation has a different vessel earning point than the intended vessel for the voyage. - The Vessel IMO No field displays a vessel's IMO number.
Note: Disabled by default. - The Internal Relet section - leave blank.
Note: Disabled by default. ONLY activates when a voyage is a Time Charter (TC) In AND the selected business unit when freezing is other than business unit in the TC contract. - Enter the index against which the voyage will be measured (or benchmarked) under TC Benchmark Index.
- Enter the percentage of the index a voyage is benchmarked against under Percent.
Note: Defaults to 100%.
- Enter either
- Click Proceed. The time charter calculation will automatically transfer to operations (Booking and Operations) as an Unallocated Voyage (i.e. a planned, and often contracted voyage, that has yet to be assigned a vessel, listed under Booking and Operations > Vessel List Tab > Unallocated).
Note: The voyage status indicator in the Voyage Estimate module changes from solid green to “T with purple background" (also referred to as “TCalc”). Only ONE unallocated voyage can be created at a time. To create additional unallocated voyages copy the estimate and repeat process or go to Booking and Operations > Vessel List > Unallocated dropdown > locate voyage. Use Copy/Move to create applicable number og voyages.
Example:
...
- Go to Modules > Booking and Operations > Booking and Operations.
- Choose the applicable Budget Version in the Vessel List tab.
- Locate the voyage to generate an unallocated voyage/s from - its details will display.
- Click the Scheduled Voyages tab. All (if any) scheduled voyage/s (allocated and unallocated) will display.
- If voyages are to be generated go to Step 5a. If not, go to Step 6.
- Either
- click Add Voyage to add a single blank scheduled voyage to the Scheduled Voyages tab or
- click Auto Schedule... to schedule voyage/s with an endpoint or or with fixed intervals:
- Fill in the fields as follows (as applicable):
- If Schedule with fixed endpoints:
- Enter the start date under From Date:.
- Enter the end date under To Date:.
- Enter the number of voyages to be created under Number of Voyages:
- Enter the number of laycan days under LayCan Spread:.
- If Schedule with fixed intervals:
- Enter the start date under From Date:.
- Enter the number of voyages to be created under Number of Voyages:
- Select the number of interval months from the drop-down menu under Inverval.
- Enter the number of interval days under Interval.
- Enter the number of laycan days under LayCan Spread:.
- If Schedule with fixed endpoints:
- Click Generate. Once generated, a pop-up opens advising the number of generated voyages. Click OK. The number of generated voyages with laycan dates will be added as rows in the Scheduled Voyages tab.
- Locate the voyage to create unallocated voyages from.
- Click Create Unallocated Voyages.
Example: - A pop-up opens requesting confirmation to create unallocated voyage/s. Click Yes.
- Once generated, a pop-up opens advising the number of generated voyages. Click OK.
- The new voyages will display as copies of the voyáge it/they were based on - with laycan (if based on a COA, copied from the COA) but without allocated vessel - in the Unallocated List.
IMPORTANT: If selected "base-voyage" has both alloocated and unallocated voyages scheduled, the VMS will ONLY create new unallocted voyges based on existing unallocated voyages - NOT on the allocted ones. - Check om reser egne reiser med laycan?
Example:
Ny bild från UNallocated tab listing generated unallocated voyages.
How to Create an Unallocated Voyage using the COA Planner
...